The 45% SEAI Solar Grant for Businesses and Farms

SEAI has increased its commercial solar grant to an effective 45% of the cost, for new applications made between 6 October 2026 and 6 July 2027. Grants of up to €325,200 are available for systems up to 1MWp.

South West Solar designs and installs solar for businesses, farms, schools and community groups across Limerick, Kerry, Cork, Clare and beyond. We'll help you understand your options and the steps involved.

45%

effective grant rate

€325,200

maximum grant


6 July 2027

application deadline

1MWp

maximum system size



How much is the SEAI business solar grant?

The grant is officially called the Non-Domestic Microgen Grant (NDMG), and it's based on the size of your solar PV system. When your installation is complete, SEAI pays the lower of the set grant value for your system size or 45% of the invoiced cost, up to a maximum of €325,200.

The 45% rate is only available for new applications made from 6 October 2026. Existing applications won't be increased.

  • Grant rate: effective 45% of the cost
  • Maximum grant: €325,200
  • System size: up to 1MWp (1,000kWp)
  • Window: new applications 6 October 2026 to 6 July 2027
  • Key rule: your grant offer must be in place before installation begins

Who can apply for the commercial solar grant?

Farms
Agricultural businesses and farm buildings.

Schools
Primary and post-primary schools.

Community Centres

Sports clubs, halls and community buildings.

Businesses
From small local shops to large manufacturing sites.

Non-Profits
Charities and non-profit organisations.

Public Sector Bodies
Public
buildings and organisations.

Aerial view of a large industrial building with extensive rooftop solar panels, parked vehicles, storage tanks, and gravel access roads.

Solar grant for farms

TAMS or SEAI: which solar grant suits your farm?

Farms have two main routes to solar grant support. TAMS solar (the Solar Capital Investment Scheme) pays a higher rate of 60% on up to €90,000 of investment, but applications are scored and ranked in tranches.

With SEAI's 45% grant, you apply and receive a letter of offer, so you're not competing with other farms for a place. For many farms, that makes it the quicker route.

We'll help you weigh up which route suits your farm, your electricity use and your timeline.

Why invest in solar panels for your business?

Bright green piggy bank icon with a lightning bolt symbol

Reduce operating costs

Generate electricity on site and buy less from the grid.

Neon green shield outline with a checkmark inside, symbolizing security and protection.

Protect against price changes

Especially valuable if your business uses most of its electricity during the day.

Bright green circular arrows surrounding a stylized leaf icon on a black background

Support sustainability goals

Rely less on grid electricity and lower your operational emissions.

Lime green gear with wrench and checkmark icon on a black background

Use the space you have

Rooftops, ground mounts or solar carports.

How to get started

Apply for your grant offer
Your letter of offer must be in place before any work begins. Offers are valid for eight months.

Grid connection
We apply to ESB Networks to connect your system. This takes at least four weeks.

Installation

We install your system and submit the completion documents to SEAI.

Free site assessment
We look at your premises, electricity use and available space.

Grant payment
Once all documents are in, SEAI typically pays within four to six weeks.

Frequently asked questions

Hear from Our Happy Customers

Don't miss the 45% window

Applications must be made by 6 July 2027, and your grant offer must be in place before installation begins. Book a free site assessment to get started.